Professional. Qualified. Local.
Flat Roofing in Rochester
Flat roofing across Rochester and the ME1 to ME3 postcode area. Flat roofs in EPDM, GRP and felt.
- 0+
Years Experience
- 0+
Kent towns covered
- 0%
Fixed Pricing
Local, reliable, fully insured
Flat Roofing in Rochester, ME1 to ME3
Flat roofs on older property are often hidden behind a parapet, which means the outlet and the parapet flashing matter as much as the covering.
Covering Rochester and the surrounding ME1 to ME3 postcode area. Your approved roofer provides a written quote with the scope set out before any work starts, and will raise anything found once the covering is lifted before carrying on.
Professional Process
What Work Is Involved?
EPDM rubber membrane roofs
GRP fibreglass roofs
Torch-on felt systems
Warm and cold deck build-ups
Correcting falls and standing water
Rainwater outlets, drips and upstand detailing
Why Choose Us for Flat Roofing in Rochester
We cover Rochester and the ME1 to ME3 postcode areas. The rest of Medway is covered too, so an address just outside the town is still in range. Our approved roofing specialists handle flat roofing in Rochester, and they are fully insured and appropriately qualified for work at height. We do not quote for flat roofing without seeing the roof first, and the quote sets the scope out in writing rather than handing you a bare figure. A flat roof that looks sound from a window can still be holding water, so the first thing checked is where it drains to and whether it still gets there.
Falls Before Finish
A flat roof is not flat. If it does not fall to an outlet, no covering keeps it dry for long, so the falls and the drainage are settled before the finish is chosen.
EPDM, GRP Or Felt, Explained
Each system suits a different roof, span and detail. You are told which one is being proposed and why, rather than getting whichever one is quickest to fit.
Upstands And Trims
Water gets into a flat roof at the edges and the abutments. Upstand heights, drips and trims are specified rather than decided on the day.
Access Sorted Before The Date
Most roof work needs scaffolding or a tower, and it is arranged as part of the job rather than left for you to organise. Where access crosses a neighbour's ground, that is agreed before anything goes up.
The Site Left As It Was Found
Old tiles, felt and nails come off the roof and go with us. Gardens, drives and gutters are cleared at the end of each day rather than only at the end of the job.
Answerable After The Scaffold Comes Down
Finishing the job is not the end of it. If something is not right once the scaffold is down, you call the same number you called first and it gets looked at.

Serving the Area
Georgian frontages and older survivals packed into a listed core, then plain suburban housing beyond.