Professional. Qualified. Local.
Concrete for footings and foundations in Ramsgate
How does concrete reach a footing below pavement level in Ramsgate? Usually through a hose, because a basement area at the front of a Regency terrace sits between the lorry and the building and a chute does not cross it. Kent Readymix arranges ready-mix concrete for footings and foundations across Ramsgate.
- 0+
1-2-1
Personal Service
One Supplier, One Quotation
Local, reliable, fully insured
Below-pavement bases and Manston-side pads
Ramsgate’s Regency and early Victorian stock gives its foundation work an unusual shape. Much of it is at or below pavement level: bases in basement and lower ground rooms, pads under new structural openings, and support work where a terrace is being converted back from flats or into them.
The harbour and the industrial land on the Manston side are the counterweight, with pad and strip foundations for units, plinths for plant and yard structure bases on ground that takes a full load anywhere on it.
A footing on the far side of a light well
The specific fact is a void. Where a terrace has a basement area at the front there is an open gap between kerb and building, usually railed, and a chute runs concrete in a straight line under gravity and does not cross it. A barrow has to go round or through, which on a cliff-top crescent can mean a long way.
For a footing that matters more than for a surface pour, because the concrete is going below the level the vehicle is standing at, and the only alternatives are lowering it in stages or moving the vehicle somewhere it cannot go.
A line pump answers it directly. It crosses the void, goes over the railings, drops into the excavation and keeps the pour continuous, which a trench needs because a cold joint in a footing is in the worst possible place. Gradient is the second layer: the ramps down to the Royal Harbour are steep and the crescents are narrow, so the standing position is checked for slope before anything is booked.
What to tell us about a Ramsgate footing
Say whether there is a basement area, a light well or railings between road and building, and whether the pour is below pavement level. Your quotation, delivery and payment are agreed directly with the approved supplier appointed to your pour.
Send the detail to hello@kentreadymix.co.uk and an approved supplier will confirm the mix, the volume and the delivery window.
Professional Process
What Work Is Involved?
Why Choose Us for Concrete for footings and foundations in Ramsgate

Serving the Area
Concrete for Ramsgate, where a basement area at the pavement edge often puts the pour out of a chute's reach.